1 00:00:16,129 --> 00:00:13,789 Saturn five quarterly film report number 2 00:00:19,330 --> 00:00:16,139 four covers progress during the period 3 00:00:21,800 --> 00:00:19,340 September October November 1963 4 00:00:32,420 --> 00:00:21,810 highlighting Saturn ground test stage 5 00:00:34,459 --> 00:00:32,430 construction s 1c efforts at Marshall 6 00:00:36,560 --> 00:00:34,469 this quarter were primarily in support 7 00:00:40,250 --> 00:00:36,570 of the test fuel tank and the static 8 00:00:42,709 --> 00:00:40,260 firing test stage installation of s 1c 9 00:00:45,319 --> 00:00:42,719 test tank upper bulkhead @e slosh 10 00:00:47,479 --> 00:00:45,329 battles was completed in early October 11 00:00:52,090 --> 00:00:47,489 following receipt of the previously 12 00:00:57,830 --> 00:00:55,369 the lower bulkhead and wiring for the 13 00:00:58,849 --> 00:00:57,840 test fuel tank were welded together in 14 00:01:00,889 --> 00:00:58,859 late September 15 00:01:03,290 --> 00:01:00,899 prior to installation of the bulkhead 16 00:01:08,770 --> 00:01:03,300 polar cap as originally scheduled to 17 00:01:14,539 --> 00:01:11,870 the polar cap Philips problem for the 18 00:01:17,690 --> 00:01:14,549 test fuel tank was resolved by October 19 00:01:19,789 --> 00:01:17,700 1st and the cap was welded in place and 20 00:01:21,649 --> 00:01:19,799 he sloshed baffles were later installed 21 00:01:25,810 --> 00:01:21,659 completing assembly of the lower 22 00:01:28,219 --> 00:01:25,820 bulkhead Marshalls recently completed 23 00:01:31,219 --> 00:01:28,229 hydrostatic test and vertical Assembly 24 00:01:33,590 --> 00:01:31,229 Building was placed in operation in 25 00:01:36,260 --> 00:01:33,600 early November for the first time to 26 00:01:38,870 --> 00:01:36,270 accomplish vertical assembly of the s 1c 27 00:01:41,480 --> 00:01:38,880 test fuel tank the fuel tank upper 28 00:01:44,359 --> 00:01:41,490 assembly consisting of bulkhead wiring 29 00:01:48,260 --> 00:01:44,369 and skin section was first hoisted into 30 00:01:50,450 --> 00:01:48,270 the hydrostatic Tower where it remained 31 00:01:52,789 --> 00:01:50,460 while the lower assembly was inverted by 32 00:01:56,240 --> 00:01:52,799 means of a turning device aboard the C 33 00:01:58,340 --> 00:01:56,250 frame s 1 C components transporter after 34 00:02:00,889 --> 00:01:58,350 inversion the lower assembly was moved 35 00:02:06,530 --> 00:02:00,899 inside and lowered into position in the 36 00:02:08,570 --> 00:02:06,540 vertical assembly pit the upper assembly 37 00:02:11,059 --> 00:02:08,580 was then lifted by cranes under the 38 00:02:12,650 --> 00:02:11,069 lower assembly for mating after the 39 00:02:13,610 --> 00:02:12,660 proper alignment had been made between 40 00:02:19,900 --> 00:02:13,620 the two assembly 41 00:02:25,160 --> 00:02:23,150 assembly of the s-1 seed test fuel tank 42 00:02:30,400 --> 00:02:25,170 aft adapter assembly neared completion 43 00:02:36,380 --> 00:02:33,770 assembly of the fuel tank for the s1 CT 44 00:02:39,140 --> 00:02:36,390 the static firing test stage got 45 00:02:41,180 --> 00:02:39,150 underway this court the lower bulkhead 46 00:02:43,970 --> 00:02:41,190 has been completed and work is in 47 00:02:46,130 --> 00:02:43,980 progress on the upper bulkhead work on 48 00:02:51,920 --> 00:02:46,140 the first LOX bulkhead will begin in 49 00:02:55,699 --> 00:02:51,930 December welding of cylindrical skin 50 00:02:58,520 --> 00:02:55,709 sections began in November erection of 51 00:03:00,470 --> 00:02:58,530 the main assembly fixture for the s-1 CT 52 00:03:03,110 --> 00:03:00,480 thrust structure at Marshall has been 53 00:03:04,670 --> 00:03:03,120 completed this plus installation of the 54 00:03:07,039 --> 00:03:04,680 center engine support fixture 55 00:03:09,350 --> 00:03:07,049 essentially completed the Boeing portion 56 00:03:13,069 --> 00:03:09,360 of the s-1 sea tooling erection program 57 00:03:17,059 --> 00:03:13,079 in addition Boeing also delivered two 58 00:03:19,309 --> 00:03:17,069 MSFC all s1 CT fuel tank bulkhead 59 00:03:23,449 --> 00:03:19,319 tooling assembly of the thrust structure 60 00:03:26,390 --> 00:03:23,459 began in November construction at 61 00:03:28,819 --> 00:03:26,400 Marshall of an s-1 sea stage simulator 62 00:03:31,430 --> 00:03:28,829 by Martin Baltimore was completed in 63 00:03:33,349 --> 00:03:31,440 October the simulator will be used to 64 00:03:35,930 --> 00:03:33,359 provide weight and center of gravity 65 00:03:40,729 --> 00:03:35,940 data for transportation handling and 66 00:03:43,159 --> 00:03:40,739 test our clearances at Marshall's s1 see 67 00:03:45,259 --> 00:03:43,169 static test stand erection of the steel 68 00:03:47,839 --> 00:03:45,269 superstructure was finished this quarter 69 00:03:50,330 --> 00:03:47,849 all deflectors support trusses have been 70 00:03:52,809 --> 00:03:50,340 in placed installation of the deflector 71 00:03:54,770 --> 00:03:52,819 manifolds and piping is underway 72 00:03:58,330 --> 00:03:54,780 installation of the Technical Systems 73 00:04:02,059 --> 00:03:58,340 for the stand is proceeding on schedule 74 00:04:04,129 --> 00:04:02,069 at Marshall's Michou operations Boeing's 75 00:04:06,199 --> 00:04:04,139 s once the activity this quarter 76 00:04:08,690 --> 00:04:06,209 consisted largely of installation of 77 00:04:10,759 --> 00:04:08,700 tooling and fixtures such as this upper 78 00:04:14,710 --> 00:04:10,769 and lower thrust ring assembly fixture 79 00:04:18,020 --> 00:04:14,720 which was fabricated at Boeing Wichita 80 00:04:20,539 --> 00:04:18,030 in this inner tank sub assembly fixture 81 00:04:23,300 --> 00:04:20,549 three panels will be spliced forming a 82 00:04:25,310 --> 00:04:23,310 60-degree segment of the inner tank six 83 00:04:29,640 --> 00:04:25,320 such segments will comprise a full 84 00:04:34,990 --> 00:04:33,040 the first enter tank which was a half of 85 00:04:37,089 --> 00:04:35,000 an entered tank assembly for the test 86 00:04:43,360 --> 00:04:37,099 fuel tank has been completed and shipped 87 00:04:45,480 --> 00:04:43,370 to MSFC the forward handling ring will 88 00:04:48,040 --> 00:04:45,490 be assembled in this fixture at miss you 89 00:04:50,200 --> 00:04:48,050 the forward handling ring will be used 90 00:04:52,839 --> 00:04:50,210 in assembly and transportation of the 91 00:04:55,120 --> 00:04:52,849 major components of the s-1 C stage and 92 00:05:00,309 --> 00:04:55,130 will become part of the transporter for 93 00:05:02,529 --> 00:05:00,319 the entire stage construction continued 94 00:05:05,469 --> 00:05:02,539 on misused vertical Assembly Building in 95 00:05:07,779 --> 00:05:05,479 hydrostatic test stand by November first 96 00:05:10,059 --> 00:05:07,789 Boeing had been granted beneficial 97 00:05:12,249 --> 00:05:10,069 occupancy and was installing the bridge 98 00:05:16,120 --> 00:05:12,259 crane and other facilities inside the 99 00:05:18,850 --> 00:05:16,130 building at Boeing Wichita profile 100 00:05:20,589 --> 00:05:18,860 milling of the upper cap for the 33 foot 101 00:05:22,990 --> 00:05:20,599 long Center engine support has been 102 00:05:25,420 --> 00:05:23,000 performed this is part of the thrust 103 00:05:27,399 --> 00:05:25,430 structure assembly contouring is 104 00:05:32,200 --> 00:05:27,409 necessary to fit the cap to the sheer 105 00:05:34,330 --> 00:05:32,210 web assemblies at Boeing Seattle's 106 00:05:36,700 --> 00:05:34,340 saturn v support work continued 107 00:05:38,800 --> 00:05:36,710 including compression testing on a panel 108 00:05:41,439 --> 00:05:38,810 simulating the oxidizer tank skin 109 00:05:43,629 --> 00:05:41,449 configuration test data recorded 110 00:05:45,520 --> 00:05:43,639 included applied load versus 111 00:05:47,800 --> 00:05:45,530 longitudinal deflection of the panel 112 00:05:50,140 --> 00:05:47,810 ultimate load sustained strain 113 00:05:57,070 --> 00:05:50,150 distribution in the panel versus applied 114 00:05:59,469 --> 00:05:57,080 load and failure mode at North American 115 00:06:02,140 --> 00:05:59,479 Aviation's space and Information Systems 116 00:06:04,270 --> 00:06:02,150 Division s2 structural test stage 117 00:06:06,309 --> 00:06:04,280 fabrication and assembly continued 118 00:06:10,059 --> 00:06:06,319 during the report period at the seal 119 00:06:12,580 --> 00:06:10,069 beach final assembly facility by early 120 00:06:14,920 --> 00:06:12,590 October welding was completed on the 12 121 00:06:21,040 --> 00:06:14,930 thick thin parts required for the aft 122 00:06:22,689 --> 00:06:21,050 common static bulkhead at seal Beach the 123 00:06:26,279 --> 00:06:22,699 structural steel framing for the 124 00:06:28,629 --> 00:06:26,289 vertical Assembly Building is complete 125 00:06:30,760 --> 00:06:28,639 functional check out of the 50 ton 126 00:06:33,879 --> 00:06:30,770 capacity gantry crane has been 127 00:06:35,860 --> 00:06:33,889 successfully performed two ovens to heat 128 00:06:38,710 --> 00:06:35,870 treat honeycomb cores have been 129 00:06:40,810 --> 00:06:38,720 certified at 130 00:06:42,910 --> 00:06:40,820 Santa Susana propulsion fields 131 00:06:45,700 --> 00:06:42,920 laboratory facility the locked storage 132 00:06:47,860 --> 00:06:45,710 vessel has been accepted by s and ID and 133 00:06:53,010 --> 00:06:47,870 the liquid hydrogen storage vessel is 134 00:06:57,550 --> 00:06:55,990 the inner and outer bulkhead domes for 135 00:06:59,830 --> 00:06:57,560 the battleships liquid hydrogen 136 00:07:02,560 --> 00:06:59,840 propellant tanks are in the final stage 137 00:07:04,570 --> 00:07:02,570 of fabrication the LOX propellant tank 138 00:07:11,410 --> 00:07:04,580 and the inner and outer liquid hydrogen 139 00:07:13,450 --> 00:07:11,420 tank walls have been fabricated the s2 140 00:07:15,880 --> 00:07:13,460 battleship thrust structure was finished 141 00:07:17,920 --> 00:07:15,890 at s and I DS Los Angeles division in 142 00:07:20,170 --> 00:07:17,930 November and was delivered to Santa 143 00:07:25,300 --> 00:07:20,180 Susana for installation scheduled to 144 00:07:27,520 --> 00:07:25,310 start in December deliveries to the koko 145 00:07:29,950 --> 00:07:27,530 one battleship test stand this quarter 146 00:07:33,060 --> 00:07:29,960 included flame deflector superstructure 147 00:07:35,350 --> 00:07:33,070 and mechanical and electrical systems 148 00:07:38,260 --> 00:07:35,360 similar items have been delivered to the 149 00:07:40,150 --> 00:07:38,270 Coco for all systems tests and and the 150 00:07:46,690 --> 00:07:40,160 service tower has been erected to over 151 00:07:48,880 --> 00:07:46,700 two-thirds of its full elevation study 152 00:07:51,760 --> 00:07:48,890 of the base area portion of the s2 153 00:07:53,830 --> 00:07:51,770 electromechanical mock-up has provided s 154 00:07:55,420 --> 00:07:53,840 and ID engineers with information 155 00:08:01,960 --> 00:07:55,430 pertaining to the installation of the 156 00:08:04,420 --> 00:08:01,970 heat shield to j2 engine simulators were 157 00:08:06,790 --> 00:08:04,430 also delivered to s and I T the 158 00:08:08,890 --> 00:08:06,800 simulator is a functional mock-up of the 159 00:08:11,920 --> 00:08:08,900 production engine and is used as an 160 00:08:14,050 --> 00:08:11,930 advanced vehicle development aid valves 161 00:08:16,590 --> 00:08:14,060 electrical and ignition systems our 162 00:08:18,909 --> 00:08:16,600 production hardware and our operational 163 00:08:21,280 --> 00:08:18,919 components that do not operate during 164 00:08:23,140 --> 00:08:21,290 pre-flight check out our hard mock-ups 165 00:08:33,410 --> 00:08:23,150 but configuration weight and 166 00:08:38,840 --> 00:08:36,140 at Douglas Aircraft Slater Complex in 167 00:08:41,210 --> 00:08:38,850 Sacramento where s4b stages will be 168 00:08:43,550 --> 00:08:41,220 static fired the superstructure for the 169 00:08:48,500 --> 00:08:43,560 battleship test stand beta one was 170 00:08:50,200 --> 00:08:48,510 finished in late September the 171 00:08:52,550 --> 00:08:50,210 battleship tank has been assembled 172 00:08:54,590 --> 00:08:52,560 insulation has been installed and the 173 00:09:00,230 --> 00:08:54,600 tank is scheduled for installation in 174 00:09:02,540 --> 00:09:00,240 the beta one stand during December the 175 00:09:06,410 --> 00:09:02,550 beta complex block house was virtually 176 00:09:08,900 --> 00:09:06,420 completed during the quarter at beta 3 177 00:09:10,370 --> 00:09:08,910 the all systems tests and work on the 178 00:09:14,420 --> 00:09:10,380 superstructure and propellant storage 179 00:09:17,000 --> 00:09:14,430 tanks continued activity at the Douglas 180 00:09:19,160 --> 00:09:17,010 s4b mock-up area at Santa Monica 181 00:09:21,260 --> 00:09:19,170 included electrical component 182 00:09:23,660 --> 00:09:21,270 installation in the apt thrust structure 183 00:09:26,420 --> 00:09:23,670 work on electrical paneling in the apt 184 00:09:29,360 --> 00:09:26,430 skirt installation of the customer 185 00:09:32,390 --> 00:09:29,370 connect panels da C's mating area to the 186 00:09:36,110 --> 00:09:32,400 j2 engine work on the instrumentation 187 00:09:39,650 --> 00:09:36,120 probe work on the liquid oxygen probe 188 00:09:43,610 --> 00:09:39,660 and instrumentation wiring of the 189 00:09:46,100 --> 00:09:43,620 forward dome the s4 B auxilary 190 00:09:48,260 --> 00:09:46,110 propulsion subcontractors Marquardt 191 00:09:49,910 --> 00:09:48,270 company and tat Co continued 192 00:09:52,760 --> 00:09:49,920 developmental activity during the 193 00:09:55,390 --> 00:09:52,770 quarter mark watt was engaged in thrust 194 00:09:58,540 --> 00:09:55,400 chamber fabrication and testing for its 195 00:10:03,150 --> 00:09:58,550 1715 thrust liquid propellant college 196 00:10:06,810 --> 00:10:03,160 two of which will be used for p stage 197 00:10:09,630 --> 00:10:06,820 at TEPCO post-test evaluation and design 198 00:10:12,000 --> 00:10:09,640 of a pre prototype 150 pounds thrust 199 00:10:14,100 --> 00:10:12,010 attitude control engine was in progress 200 00:10:16,500 --> 00:10:14,110 because of development problems 201 00:10:19,320 --> 00:10:16,510 encountered Marshall determined that 202 00:10:21,560 --> 00:10:19,330 Tapco would develop two engines of 150 203 00:10:24,060 --> 00:10:21,570 pounds thrust one for attitude control 204 00:10:26,460 --> 00:10:24,070 requirements for Saturn 1b and five 205 00:10:29,610 --> 00:10:26,470 vehicles the other to meet college 206 00:10:31,680 --> 00:10:29,620 requirements for Saturn 5 this decision 207 00:10:41,460 --> 00:10:31,690 was made in order that the Saturn 1b 208 00:10:43,830 --> 00:10:41,470 scheduled a major milestone in the f1 209 00:10:46,020 --> 00:10:43,840 engine program was achieved on schedule 210 00:10:48,540 --> 00:10:46,030 in September with the completion of the 211 00:10:53,820 --> 00:10:48,550 first f1 production engine at rocket 212 00:10:55,200 --> 00:10:53,830 Dean's Canoga Park plant designated for 213 00:10:57,750 --> 00:10:55,210 delivery to the Marshall Space Flight 214 00:10:59,670 --> 00:10:57,760 Center the engine was first shipped for 215 00:11:04,790 --> 00:10:59,680 its acceptance testing to the large 216 00:11:11,460 --> 00:11:08,580 here test stand 1 b2 had been selected 217 00:11:13,200 --> 00:11:11,470 for the static firing series a program 218 00:11:15,510 --> 00:11:13,210 in which the engine was subjected to 219 00:11:17,820 --> 00:11:15,520 operation under carefully prescribed 220 00:11:23,090 --> 00:11:17,830 conditions 221 00:11:27,440 --> 00:11:25,760 she or separate buries the engine 222 00:11:29,390 --> 00:11:27,450 successfully meant the acceptance 223 00:11:31,910 --> 00:11:29,400 testing requirements before being 224 00:11:35,480 --> 00:11:31,920 returned the Rocketdyne plan for final 225 00:11:39,610 --> 00:11:35,490 check out the longest firing was for 117 226 00:11:44,690 --> 00:11:42,860 the initial f1 production engine was 227 00:11:50,120 --> 00:11:44,700 then transported aboard the pregnant 228 00:11:52,460 --> 00:11:50,130 guppy aircraft to the Marshall Center on 229 00:11:56,120 --> 00:11:52,470 November 19th the engine was installed 230 00:11:57,950 --> 00:11:56,130 in Marshalls s1 static test stand one 231 00:12:01,340 --> 00:11:57,960 position of which was recently modified 232 00:12:03,020 --> 00:12:01,350 to accommodate the f1 propulsion system 233 00:12:08,150 --> 00:12:03,030 testing of the engine was scheduled to 234 00:12:10,370 --> 00:12:08,160 begin in early december at edwards 235 00:12:12,680 --> 00:12:10,380 rocket site construction continued this 236 00:12:14,510 --> 00:12:12,690 quarter on a new complex to provide test 237 00:12:17,300 --> 00:12:14,520 facilities for production f-1 engines 238 00:12:20,240 --> 00:12:17,310 and to increase R&D engine test 239 00:12:22,700 --> 00:12:20,250 capabilities tank installation was 240 00:12:24,680 --> 00:12:22,710 accomplished on stand 1c and the 241 00:12:29,720 --> 00:12:24,690 superstructure was completed on 1e 242 00:12:32,030 --> 00:12:29,730 during the report period to keep pace 243 00:12:34,460 --> 00:12:32,040 with the production of both R&D and 244 00:12:36,200 --> 00:12:34,470 production engines new manufacturing 245 00:12:39,980 --> 00:12:36,210 facilities have recently been completed 246 00:12:42,410 --> 00:12:39,990 at Canoga Park over 200,000 square feet 247 00:12:45,530 --> 00:12:42,420 of manufacturing space has been added 248 00:12:50,750 --> 00:12:45,540 for the use jointly of the F 1 and J 2 249 00:12:53,420 --> 00:12:50,760 engine programs delivery of J 2 engines 250 00:12:56,060 --> 00:12:53,430 from rocket Dean's Canoga Park plant 2s 251 00:13:00,320 --> 00:12:56,070 and ID for the S 2 electromechanical 252 00:13:02,690 --> 00:13:00,330 mock-up began in late November a scale 253 00:13:05,360 --> 00:13:02,700 model of the altitude facility to be 254 00:13:08,240 --> 00:13:05,370 used at the Delta 2 test stand for the 255 00:13:10,670 --> 00:13:08,250 j2 program was tested this quarter at 256 00:13:16,700 --> 00:13:10,680 component test lab number 4 of rocket 257 00:13:19,700 --> 00:13:16,710 Dynes propulsion field laboratory the 258 00:13:22,370 --> 00:13:19,710 Delta 2 test stand which affords a 500 259 00:13:30,060 --> 00:13:22,380 second run capability for the j2 engine 260 00:13:36,070 --> 00:13:33,580 the Delta to weed position was activated 261 00:13:40,180 --> 00:13:36,080 on November 9 with the initial Larry of 262 00:13:43,090 --> 00:13:40,190 a j2 kitchen November 27 the first j2 263 00:13:45,910 --> 00:13:43,100 extended duration ground test the static 264 00:13:48,850 --> 00:13:45,920 wiry of 510 seconds was successfully 265 00:13:55,960 --> 00:13:48,860 accomplished the Delta to aim position 266 00:13:58,000 --> 00:13:55,970 will be activated in early December at 267 00:14:00,760 --> 00:13:58,010 the Marshall Space Flight Center steel 268 00:14:03,640 --> 00:14:00,770 erection for the Saturn 5 dynamic test 269 00:14:06,070 --> 00:14:03,650 stand began in early October completion 270 00:14:10,470 --> 00:14:06,080 of the 360 foot tall structure is 271 00:14:12,940 --> 00:14:10,480 scheduled in November of 1964 272 00:14:15,370 --> 00:14:12,950 construction continued this quarter on 273 00:14:20,020 --> 00:14:15,380 the Saturn 5 high pressure water system 274 00:14:22,090 --> 00:14:20,030 at Marshall the 250 pounds pressure 275 00:14:25,600 --> 00:14:22,100 industrial water system which utilizes 276 00:14:28,420 --> 00:14:25,610 huge pipes up to 8 feet in diameter will 277 00:14:30,880 --> 00:14:28,430 have a pumping capacity of 270,000 278 00:14:33,280 --> 00:14:30,890 gallons a minute millions of gallons of 279 00:14:36,670 --> 00:14:33,290 water will be forced by this system into 280 00:14:42,250 --> 00:14:36,680 flame deflectors at the s1c and f1 281 00:14:44,830 --> 00:14:42,260 engine static test stands at Marshalls 282 00:14:47,260 --> 00:14:44,840 Mississippi test operations phase 1 283 00:14:50,760 --> 00:14:47,270 dredging of the Pearl River and Little 284 00:14:53,620 --> 00:14:50,770 Lake was completed in late October the 285 00:14:56,650 --> 00:14:53,630 MTO construction dock was finished in 286 00:14:58,960 --> 00:14:56,660 November highway construction is well 287 00:15:01,990 --> 00:14:58,970 underway with some access roads also 288 00:15:04,090 --> 00:15:02,000 under construction one of the major 289 00:15:07,530 --> 00:15:04,100 buildings under construction is the 290 00:15:10,120 --> 00:15:07,540 warehouse and emergency service building 291 00:15:12,700 --> 00:15:10,130 the laboratory and engineering building 292 00:15:15,820 --> 00:15:12,710 which will serve as MTO headquarters 293 00:15:19,480 --> 00:15:15,830 will be built on this site pile-driving 294 00:15:21,790 --> 00:15:19,490 for the foundations of MTO's s2 static 295 00:15:25,600 --> 00:15:21,800 test stand began during the report 296 00:15:29,020 --> 00:15:25,610 period and excavation work for the 350